BetaONE will rise again!


 
Prev Previous Post   Next Post Next
  #1  
Old 9th Feb 04, 04:43 AM
Alpine's Avatar
Alpine Alpine is offline
Retired Crew
 
Join Date: Feb 2002
Location: Run Forest, RUN!!
Posts: 3,601
Alpine is on a distinguished road
Send a message via ICQ to Alpine Send a message via AIM to Alpine
Germany and the state of Saxony will give Advanced Micro Devices Inc. (AMD) approximately ?545 million ($683 million) in grants and allowances toward the construction of its new manufacturing plant in Dresden after the European Commission approved the aid package, AMD said Friday. The new plant, to be called AMD Fab 36, will be the company's first 300-millimeter facility when volume production commences in 2006 alongside AMD's existing 200 millimeter Dresden facility, said Drew Prairie, an AMD spokesman. By using the larger wafers, AMD can cut more chips from each wafer and reduce the manufacturing cost per chip. AMD, based in Sunnyvale, California, has no plans to convert its existing Dresden fab to 300 millimeters because it wouldn't be a cost-effective way to introduce that technology, Prairie said.



Source:


http://www.infoworld.com/article/04/...Namdaid_1.html
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 04:39 PM.


Design by Vjacheslav Trushkin for phpBBStyles.com.
Powered by vBulletin® Version 3.6.5
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.